Too much installed capacity required
#1
Hi, I am with a problem with the installed capacity required by a process, in the year 2030 the activity of the process is 3442PJ and the installed capacity in 2030 is 743GW. For the year 2035 the activity of the process is 3438PJ and the installed capacity required is 7437GW, the efficiency is the same.
Reply
#2
I have one idea why such might happen, assuming that your model is a global model. The total global peak capacity requirements might indeed increase to something like 10,000 GW by 2035, and so, if the process is a very low-cost thermal generation technology, and your model invests huge amounts into variable renewable generation with a very low peak contribution in your peak equation, and the existing capacity is mostly phased out around 2030, the process might be the cheapest option in your model to provide sufficient reserve capacity into the global electricity systems.

But if any of those assumptions are not correct (e.g. the model is not a global model), I really don't see why you would have such a high capacity (7437 GW) for one technology in 2035.  Huh
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  how to define the capacity or stock for storage? guozhi1305 6 2,648 08-05-2024, 05:47 PM
Last Post: guozhi1305
  About RNW capacity guozhi1305 4 3,280 19-05-2022, 08:13 AM
Last Post: guozhi1305
  Solar lower costs impact capacity constraints LucasD 10 10,032 18-12-2020, 03:04 PM
Last Post: AKanudia
  Storage output without capacity deployment ach 3 4,909 15-05-2020, 03:04 PM
Last Post: Antti-L
  UC Capacity Growth Constraint - Troubles at end of horizon Giulia Realmonte 20 36,395 19-04-2018, 02:13 PM
Last Post: Giulia Realmonte
Question Lower capacity, higher demand -> Still demand is met Simon Andersen 6 11,478 12-12-2017, 01:58 AM
Last Post: Simon Andersen
  Calculating total production based on capacity in Hydroelectric power plants (HEPPs) danialesm 2 6,080 30-10-2017, 06:52 PM
Last Post: danialesm
  How to set UCs for the share of power generation capacity? Xin Wang 18 38,012 14-06-2017, 08:18 PM
Last Post: Xin Wang
  constraint on new capacity added per year krakowski 1 5,244 22-10-2013, 06:41 AM
Last Post: Antti-L
  way to add costs as demand approaches capacity cyang 1 6,692 04-02-2013, 11:18 PM
Last Post: AKanudia

Forum Jump:


Users browsing this thread: 2 Guest(s)