Veda2.0 Released!


way to add costs as demand approaches capacity
#1

I'm trying to think through ideas of how to include additional costs as the demand for electricity approaches the generation capacity in a given timeslice.  The idea is to simulate the increases in electricity market prices (above and beyond the normal increase in variable costs associated with peaking power plants) that would result from peak load pricing and also transmission constraints when we get close to generation capacity constraints.  For example, I was thinking of adding an additional cost when generation exceeds 90% of total dispatchable power plant capacity and an even higher cost when generation exceed 95% of total capacity, but I'm not sure how one would set this up.  The reason for doing this is to influence the timeslice profile of electricity usage within the model (for electric vehicles and other potential flexible demands). Any thoughts or suggestions would be would be greatly appreciated. thanks Chris

Reply
#2
you can try setting up the following UC:

for each R, T, TS-

<generation from plants>  <=  .9 x <capacity of plants> x <PRC_CAPACT> + <activity of DumProc_PLPSurcharge>

ACT_COST of DumProc_PLPSurcharge will have the surcharge you want to impose. Use UC_FLO, UC_CAP and UC_ACT, respectively, for the three terms above.

and if this works, setup another one for the next slice.

HOWEVER, I strongly suspect that I have overlooked something. Otherwise Antti would have  responded to this immediately Smile
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  how to define the capacity or stock for storage? guozhi1305 6 2,275 08-05-2024, 05:47 PM
Last Post: guozhi1305
  Early Retirement Costs Felix 10 10,797 22-06-2022, 06:33 PM
Last Post: Ceas19
  About RNW capacity guozhi1305 4 3,019 19-05-2022, 08:13 AM
Last Post: guozhi1305
  Demand response from macro to times shivika 1 2,294 18-05-2021, 11:32 PM
Last Post: Antti-L
  Solar lower costs impact capacity constraints LucasD 10 9,419 18-12-2020, 03:04 PM
Last Post: AKanudia
  Time stepped algorithm -demand projection canismajoris 7 8,600 18-05-2020, 08:39 PM
Last Post: Antti-L
  Storage output without capacity deployment ach 3 4,738 15-05-2020, 03:04 PM
Last Post: Antti-L
  Using TFM_UPD table to project costs NeilGrant 2 5,503 12-09-2019, 09:33 PM
Last Post: NeilGrant
  Issue when running TIAM with Price-Elastic Demand NeilGrant 2 4,992 09-08-2019, 03:44 PM
Last Post: NeilGrant
  Demand projections and fixed initial years Pernille.S 1 3,693 29-05-2019, 09:28 PM
Last Post: Antti-L

Forum Jump:


Users browsing this thread: 1 Guest(s)