Hi, 
I am modeling HEPPs in the base scenario and I saw deviation between the total production of all HEPPs and the given balance table. 
After checking all reports related to balance table, I realized that this deviation comes from the calculation of Total Production.

For instance, we have a HEPP with the installed capacity of 2.405 GW. Considering the AFA of 0.86 and CAP2ACT (PJ/GW) 31.536, we reach to 2.405*0.86*31.536 = 65 PJ as the total production. However, this dam is producing 32 PJ based on documents. How can we explain these differences?

Thanks again
Reply
#2
As far as I can see, the obvious explanation is that your NCAP_AFA value is incorrect. It is extremely high for a hydro power plant, whether a dam-based or run-of-river plant. I think typical annual capacity factors are 0.3–0.6.

Indeed, if you correct your AFA to the value 0.422, you would reach the annual production of 32 PJ.
Reply
#3
Thank you very much. I reach to the same conclusion after reading other projects. I got these availability factors from a database. I guess their definition for AFA is different from ours. I will try to find the issue. Thanks again.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  how to define the capacity or stock for storage? guozhi1305 6 2,644 08-05-2024, 05:47 PM
Last Post: guozhi1305
  About RNW capacity guozhi1305 4 3,272 19-05-2022, 08:13 AM
Last Post: guozhi1305
  Electricity Pricing and Production in EPAUS9R eorear86 2 3,195 02-03-2021, 09:26 PM
Last Post: eorear86
  Solar lower costs impact capacity constraints LucasD 10 10,023 18-12-2020, 03:04 PM
Last Post: AKanudia
  Storage output without capacity deployment ach 3 4,908 15-05-2020, 03:04 PM
Last Post: Antti-L
  Too much installed capacity required Juliana_Barbosa 1 4,446 16-09-2018, 06:35 PM
Last Post: Antti-L
  PCG for CHP plants Anna (AKR) 10 22,303 29-05-2018, 01:25 PM
Last Post: Antti-L
  UC Capacity Growth Constraint - Troubles at end of horizon Giulia Realmonte 20 36,391 19-04-2018, 02:13 PM
Last Post: Giulia Realmonte
Question Lower capacity, higher demand -> Still demand is met Simon Andersen 6 11,475 12-12-2017, 01:58 AM
Last Post: Simon Andersen
  How to set UCs for the share of power generation capacity? Xin Wang 18 37,997 14-06-2017, 08:18 PM
Last Post: Xin Wang

Forum Jump:


Users browsing this thread: 1 Guest(s)