Veda2.0 Released!


Activating NT-PWR not in use in base year
#1
Hello, 

I am modifying my model further. I deleted the refinery sheet since no refinery in the country starting January 2021. I also remained with Industrial demand only. Due to sync problems, I deactivated ForceOplo, NukDel and the Efficiency scenarios. I intended to have Nuclear, Municipal Solid Waste Biomass, Natural Gas and Sub-bitumionous coal considered for futre power generation. I tried to ovverite these in the NT-PWR by a blank but got the attached error after the sync run. If I return them to the inactive state (with the * in column A), the model runs but these technologies are not considered. Attached in the link is the model as well. 

https://www.dropbox.com/home/KENYA-TIMES%20MODEL

Regards,
Xavier
Reply
#2
https://help.dropbox.com/files-folders/s...ith-others
Reply
#3
Hi Amit,

I have send the link> https://www.dropbox.com/sh/16g658lxb4a0p...wf1sa?dl=0 to [email protected] and [email protected]

Regards,
Xavier
Reply
#4
I am not a VEDA expert, but if you mean the error "The following Commodities have not been defined", I think the message is quite clear:  You need to define those four commodities, in a ~FI_Comm table. Shy
Reply
#5
(22-02-2021, 08:23 PM)Antti-L Wrote: I am not a VEDA expert, but if you mean the error "The following Commodities have not been defined", I think the message is quite clear:  You need to define those four commodities, in a ~FI_Comm table. Shy

Thank You Antti-L for the reply. However, the issue was that once the posted sync error is rectified, the model terminates run midway. But I have since resolved the problem. Thanks.
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Early retirement for each year Sandro_Luh 17 9,325 02-10-2023, 05:08 PM
Last Post: vincedh
  About base year process and New tech guozhi1305 0 1,061 21-05-2022, 04:53 PM
Last Post: guozhi1305
  How to set emission factor for each year of a specific process during its lifetime? Xin Wang 14 22,445 06-01-2021, 11:17 PM
Last Post: Antti-L
  A very high value electricity price in base year Antti-L 0 2,256 29-05-2020, 01:25 AM
Last Post: Antti-L
  Base year setting guozhi1305 0 2,571 06-06-2019, 12:23 PM
Last Post: guozhi1305
  Adding and deleting a new base year template in TIMES [email protected] 2 5,078 25-04-2019, 11:04 AM
Last Post: [email protected]
  Start Year Time Periods Question mbr1818 2 6,957 11-10-2017, 12:28 PM
Last Post: AKanudia
  start year violation and domain violation cyang 2 7,346 24-05-2016, 03:15 PM
Last Post: Antti-L
  CO2 BOUND will influence values in base year huichenpku 3 9,791 05-09-2015, 10:47 AM
Last Post: huichenpku
  Nuclear energy production in the base year huichenpku 1 5,229 09-08-2015, 06:42 AM
Last Post: huichenpku

Forum Jump:


Users browsing this thread: 1 Guest(s)