22-02-2021, 05:46 PM
Hello,
I am modifying my model further. I deleted the refinery sheet since no refinery in the country starting January 2021. I also remained with Industrial demand only. Due to sync problems, I deactivated ForceOplo, NukDel and the Efficiency scenarios. I intended to have Nuclear, Municipal Solid Waste Biomass, Natural Gas and Sub-bitumionous coal considered for futre power generation. I tried to ovverite these in the NT-PWR by a blank but got the attached error after the sync run. If I return them to the inactive state (with the * in column A), the model runs but these technologies are not considered. Attached in the link is the model as well.
https://www.dropbox.com/home/KENYA-TIMES%20MODEL
Regards,
Xavier
I am modifying my model further. I deleted the refinery sheet since no refinery in the country starting January 2021. I also remained with Industrial demand only. Due to sync problems, I deactivated ForceOplo, NukDel and the Efficiency scenarios. I intended to have Nuclear, Municipal Solid Waste Biomass, Natural Gas and Sub-bitumionous coal considered for futre power generation. I tried to ovverite these in the NT-PWR by a blank but got the attached error after the sync run. If I return them to the inactive state (with the * in column A), the model runs but these technologies are not considered. Attached in the link is the model as well.
https://www.dropbox.com/home/KENYA-TIMES%20MODEL
Regards,
Xavier