Hello,

I wonder if there is a specific attribute to constraint the new capacity from a power plant over the entire time horizon? For example, I have a wind power plant and only 108GW of this power plant can be installed over the entire time horizon. Below is the equation for the constraint I need:

 (New capacity of wind plant in 2015+New capacity of wind plant in 2020+....+New capacity of wind plant in 2050) < 108GW

I looked at attribute master, but most of the capacity related attributes need time period (such as UC_NCAP).

Thanks,
Samaneh

Reply
#2
See if the following example of a cumulative UC constraint could be of help to you:


Reply
#3
Dear Antti,

Thank you so much. It worked Smile

Samaneh
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  time variant emission coefficient dgchoi 5 13,041 26-06-2023, 04:09 PM
Last Post: Antti-L
  SHARE-I/O for all process and all time horizon ejin 7 4,320 08-03-2023, 10:55 AM
Last Post: AKanudia
  user constraint on subset of emissions Stefan 2 2,833 10-11-2021, 08:26 PM
Last Post: Stefan
  DACCS Emissions Constraint not working UKTM User 10 9,422 07-10-2021, 03:30 PM
Last Post: UKTM User
  Functionality of the RPS constraint xavier 3 4,370 02-05-2021, 07:07 PM
Last Post: Antti-L
  User constraint for minimum storage activity Anjali 4 4,623 15-01-2021, 07:38 PM
Last Post: Anjali
  Issue with constraint: Error Code 172 NeilGrant 5 7,415 28-05-2020, 02:08 PM
Last Post: NeilGrant
  Problems to sync a small model with 8736 time-slices Pernille.S 21 38,340 28-05-2020, 12:01 AM
Last Post: AKanudia
  Time stepped algorithm -demand projection canismajoris 7 8,866 18-05-2020, 08:39 PM
Last Post: Antti-L
  Tips for reducing syncing time of SysSettings? Pernille.S 2 5,466 14-11-2019, 02:19 PM
Last Post: Pernille.S

Forum Jump:


Users browsing this thread: 1 Guest(s)