20-09-2025, 08:22 PM
Excuse me,
Scenario 1: A 10GW bidirectional transmission link exists between Region A and Region B.
Scenario 2: A 10GW unidirectional transmission link exists between Region A and Region B.
When defining capacity stock, should it be defined in both Region A and Region B, or only in one region? Beyond specifying bidirectional or unidirectional transmission, are there other differences to note during these two definition processes?
I would be most grateful if you could reply.
Scenario 1: A 10GW bidirectional transmission link exists between Region A and Region B.
Scenario 2: A 10GW unidirectional transmission link exists between Region A and Region B.
When defining capacity stock, should it be defined in both Region A and Region B, or only in one region? Beyond specifying bidirectional or unidirectional transmission, are there other differences to note during these two definition processes?
I would be most grateful if you could reply.
