Veda2.0 Released!


Assistance Required for Power Sector
#1
Dear Veda Forum Members,

I am currently developing model for the power sector from scratch, utilizing Manuals 2 and 4. I would appreciate your assistance with the following issues:
Query 1(IMP/EXP Sheet)
I have added an interconnector with an availability factor for 2018. However, the results display the same values up to 2050. How can I interpolate and extrapolate different values for different years?

Future New Interconnectors
I have defined the capacity and price in the SubRes new tech file for future interconnectors. Despite this, the model output shows only the price, without the output of the interconnectors.
Query 2:
How can I resolve this issue to ensure that the interconnectors' outputs are accurately reflected in the model?

New Power Plants in SubRes File
I have listed new power plants (including on-shore wind, off-shore wind, solar, hydrogen, gas with CCS, and biomass with CCS) in the SubRes file. However, the model only selects one power plant to meet the demand.
Query 3:
What mistake might I be making that prevents the model from considering multiple options? How can I ensure that the model includes multiple power plants to meet the demand? I attempted using CAPBND by creating a SUPPXLS scenario file, but it did not yield the desired results.

Exporting Surplus Renewable Energy

Query 4:
How can I define that extra renewable energy should be exported within the interconnectors' capacity when there is a surplus, stored in storage, or used to produce hydrogen from surplus energy?

Hydrogen as New Technology
I have added hydrogen as a new technology in the model, covering all steps (production, liquefaction, delivery, storage). The list of new tech power plants and hydrogen processes is shown in VAR_NcapM in results.
Query 5: How can I ensure that the new hydrogen technologies are correctly integrated into the model?

Background of My Model:
  1. I have included a list of power plants to generate fixed energy up to their end life, considering their availability factor.

  2. The power sector's demand is known, and I have applied population growth for forecasting.

  3. I have added new renewable power plants to the system in the SubRes folder.

  4. I am also experiencing difficulties defining user constraints.



I have attached all files of model. Your guidance and insights on these issues would be greatly appreciated.
Thank you in advance for your support.
Best regards,
Danish


Attached Files
.xls   SysSettings.xls (Size: 136 KB / Downloads: 3)
.xlsx   SubRES_ELC_ElectricityStorage.xlsx (Size: 13.73 KB / Downloads: 3)
.xlsx   SubRES_ELC_ElectricityStorage_Trans.xlsx (Size: 177.57 KB / Downloads: 2)
.xls   SubRES_NewTechs.xls (Size: 406.5 KB / Downloads: 4)
.xlsx   SubRES_NewTechs_Trans.xlsx (Size: 12.77 KB / Downloads: 3)
.xlsx   SubRES_SUP_Hydrogen.xlsx (Size: 797.78 KB / Downloads: 3)
.xlsx   SubRES_SUP_Hydrogen_Trans.xlsx (Size: 177.7 KB / Downloads: 3)
.xlsx   Scen_RNW_Potentials.xlsx (Size: 118.84 KB / Downloads: 3)
.xls   VT_REG_PWR.xls (Size: 189 KB / Downloads: 3)
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  Request for Help in Result sheet of Power sector not showing the Power plants Iram 5 183 15-11-2024, 01:37 AM
Last Post: Iram
Photo Problem in New hydro power plant Anita Prajapati 2 3,952 09-12-2020, 09:46 AM
Last Post: Anita Prajapati

Forum Jump:


Users browsing this thread: 1 Guest(s)