I am trying to run the power sector ELC file with the supply file PRI, but in that case, it does not show any power plant in VarF_out. If I remove the PRI file, then it works fine on an annual basis, not an hourly basis.
If I remove the PRI file, a supply sheet with cost data, my power plants become free and available at no cost. I am not sure where I made the mistake that the PRI file is not letting the output; it shows only interconnectors in the output.
I will request that if anyone can have a look and guide me through his/her expertise.
I could take a look at the files, if you would share it "with anyone with the link". Google Drive has that option for sharing, but the link you gave above does not allow me to access with the link.
(14-11-2024, 01:06 AM)Antti-L Wrote: I could take a look at the files, if you would share it "with anyone with the link". Google Drive has that option for sharing, but the link you gave above does not allow me to access with the link.
(14-11-2024, 01:06 AM)Antti-L Wrote: I could take a look at the files, if you would share it "with anyone with the link". Google Drive has that option for sharing, but the link you gave above does not allow me to access with the link.
Dear Antti,
Can you access the following link by Ravinder. Please let me know. I will send it to you directly. Because I cant upload zip folder, I tried several times.
can you please have a look and let me know what is issue. I will be really grateful for your time and help.
I corrected numerous issues, and the model was then running without errors and without dummy imports. There were e.g. missing commodities, inconsistent timeslice levels, free electricity imports, infeasible constraints etc. etc.
Although the model then seemed to be running basically ok, the model is missing demands and demand load profiles, and so the results are meaningless. Note also that your export prices are higher than import prices, which makes the model import as much as possible electricity for exports. Anyway, I attach the modified files for you in case they might help. Note that because some of the files were large due to many images, I removed many images to make the ZIP file smaller for uploading here.
The following 1 user Likes Antti-L's post:1 user Likes Antti-L's post • Iram
(14-11-2024, 11:55 PM)Antti-L Wrote: Yes, I looked at the files now.
I corrected numerous issues, and the model was then running without errors and without dummy imports. There were e.g. missing commodities, inconsistent timeslice levels, free electricity imports, infeasible constraints etc. etc.
Although the model then seemed to be running basically ok, the model is missing demands and demand load profiles, and so the results are meaningless. Note also that your export prices are higher than import prices, which makes the model import as much as possible electricity for exports. Anyway, I attach the modified files for you in case they might help. Note that because some of the files were large due to many images, I removed many images to make the ZIP file smaller for uploading here.
Thank you so much, Antti for your kind help. Its really appreciated; I was waiting for your response.