12-03-2024, 05:31 PM
Hello everyone, thanks for your time.
I'm reaching out to ask a model infeasible question. Currently, I am trying to divide the power system of China in the model into power systems of different regions in a global model.
My idea is to add the new process that defines all the power related processes in different regions of China, eg: previously ewind105, now add ewind115, ewind125, ewind135 .... Since this is a global model, the old technology will be valid for other countries in the definition of tech selection , and the new process will be valid for China.
However after modifying and running it, the model always shows infeasibility about technologies that have nothing to do with the power sector and China, which I haven't modified it.
The .lst file has been attached. the current infeasible part is
Number of equations in the conflict: 2.
fixed: EQ_ACTFLO(UK,2006,2025,CH1NGA005,ANNUAL) = 0
fixed: EQE_CAPACT(UK,2006,2025,CH1NGA005,ANNUAL) = 0
Number of variables in the conflict: 1.
lower: VAR_NCAP(UK,2006,CH1NGA005) > 11.377
CPXPARAM Tune TimeLimit
160G6
CPXPARAM SolutionType
2
CPXPARAM Barrier Limits Iteration
999999
Infeasibility row 'EQE_CAPACT(IND.2006.2025.'CC1ELF005'.ANNUAL)':0 0.0432661.
Presolve time 0.20 sec.(124.49 ticks)
Barrier time 0.22 sec.(124.49 ticks)
I haven't changed the CH1NGA005 technique, so I don't know what's wrong with it, although it's in the same excel file as the power system technique I've changed.
Many Thanks.
I'm reaching out to ask a model infeasible question. Currently, I am trying to divide the power system of China in the model into power systems of different regions in a global model.
My idea is to add the new process that defines all the power related processes in different regions of China, eg: previously ewind105, now add ewind115, ewind125, ewind135 .... Since this is a global model, the old technology will be valid for other countries in the definition of tech selection , and the new process will be valid for China.
However after modifying and running it, the model always shows infeasibility about technologies that have nothing to do with the power sector and China, which I haven't modified it.
The .lst file has been attached. the current infeasible part is
Number of equations in the conflict: 2.
fixed: EQ_ACTFLO(UK,2006,2025,CH1NGA005,ANNUAL) = 0
fixed: EQE_CAPACT(UK,2006,2025,CH1NGA005,ANNUAL) = 0
Number of variables in the conflict: 1.
lower: VAR_NCAP(UK,2006,CH1NGA005) > 11.377
CPXPARAM Tune TimeLimit
160G6
CPXPARAM SolutionType
2
CPXPARAM Barrier Limits Iteration
999999
Infeasibility row 'EQE_CAPACT(IND.2006.2025.'CC1ELF005'.ANNUAL)':0 0.0432661.
Presolve time 0.20 sec.(124.49 ticks)
Barrier time 0.22 sec.(124.49 ticks)
I haven't changed the CH1NGA005 technique, so I don't know what's wrong with it, although it's in the same excel file as the power system technique I've changed.
Many Thanks.