Posts: 85
Threads: 17
Likes Received: 0 in 0 posts
Likes Given: 0
Joined: May 2010
Hi Amit
I created a new SubRes scenario with a set of technologies.
After SYNC, I noticed that a new parameter IBOND(BD)~FX has been generated
automatically for a selected number of technologies in three periods.
This new parameter is shown in an unknown worksheet ‘VNTG’
When I tried to edit, it shows a message “Pending contact at
[email protected]” . Could you please advice me, how this new parameter is created? I have shown ScreenPrt for your Ref.
Because of this, the model gives an infeasible solution, caused by another UC!
Thanks
Kannan
Posts: 85
Threads: 17
Likes Received: 0 in 0 posts
Likes Given: 0
Joined: May 2010
Thanks a lot, now it works!
Should I always uncheck the box 'Generate Vintage Bound', as I didn’t have this problem before? or Have I made anything wrong in this particular scenario?
Just on curiosity, why is this bound created only for selected technologies, but not for all technologies? What’s the basis for the selection of technologies?
Posts: 85
Threads: 17
Likes Received: 0 in 0 posts
Likes Given: 0
Joined: May 2010
thanks, I got it from VEDASupport.