Hi;
I want to develop a constrain where if one plant is selected, other plant should not be selected.
This approach will help me to see alternatives within the same technology development. Do you have any suggestion please?
Thanks
Tibebe
Posts: 2
Threads: 1
Likes Received: 0 in 0 posts
Likes Given: 0
Joined: Apr 2012
Clarification
Here is the issue. It is not a new investment, but I want to use
the existing thermal plants as they are AND at the same time, develop the
same thermal plants after retrofitting with dry cooling system.
In doing so, There is performance and cost penalty (capital cost, OM cost, heat
rate and generation loss accounted for each of the thermal plants).
Then, I gave the plants with the retrofits a new process name
different from the formers.
But my question is, is there a constraint that allows either the
existing OR the one with retrofits but not both? Also, I want to know to use the constraint not to select
both the existing and its derivative (after retrofits) at the same
time? Is there any method to define issues?
Thanks
Tibebe