30-07-2024, 01:21 AM
(This post was last modified: 30-07-2024, 01:24 AM by [email protected].)
Hi,
I am confused about the relationship between Reg_ACost and ObjZ. I am trying to use Reg_ACost to calculate total cost (the sum of all regions of the product of Reg_ACost*Timeperiod), however, the calculated value doesn't equal to the ObjZ. What could maybe missed by me?
Best,
Xiao
I am confused about the relationship between Reg_ACost and ObjZ. I am trying to use Reg_ACost to calculate total cost (the sum of all regions of the product of Reg_ACost*Timeperiod), however, the calculated value doesn't equal to the ObjZ. What could maybe missed by me?
Best,
Xiao