15-09-2018, 04:09 PM
Hi, I am with a problem with the installed capacity required by a process, in the year 2030 the activity of the process is 3442PJ and the installed capacity in 2030 is 743GW. For the year 2035 the activity of the process is 3438PJ and the installed capacity required is 7437GW, the efficiency is the same.