11-08-2021, 03:48 PM
Dear Mr/Mrs,
I have a problem running a TIMES model. The model was succesfully synchronized and no errors were shown. After solving it using CPLEX engine I found out that the data acquired are not viable. Then I tried to add another parameter inside a process defined in the model (green mark inside the attached Excel file) and running the solver afterwards. This time an error occured meaning that the new parameter made the model infeasible.
Could you please give me any advice on that? It appears to be some kind of general problem of the whole model instead of singular process definitons or so.
There are two attachments showing the Excel table with the parameter newly added and the error logs.
Thank you.
Kind regards,
Lukas Novak
I have a problem running a TIMES model. The model was succesfully synchronized and no errors were shown. After solving it using CPLEX engine I found out that the data acquired are not viable. Then I tried to add another parameter inside a process defined in the model (green mark inside the attached Excel file) and running the solver afterwards. This time an error occured meaning that the new parameter made the model infeasible.
Could you please give me any advice on that? It appears to be some kind of general problem of the whole model instead of singular process definitons or so.
There are two attachments showing the Excel table with the parameter newly added and the error logs.
Thank you.
Kind regards,
Lukas Novak