28-06-2019, 06:32 PM
Thanks Antti-L,
I want to calculate the LCOE for each power technology in my Indian power system model projected till 2050. However, when activating Levelized Cost switch in Case Manager, and using Var_NcapR in V-BE, I am getting weird results.
What is the best way to calculate Levelized cost (INR/kwh) using VEDA ?
I want to calculate the LCOE for each power technology in my Indian power system model projected till 2050. However, when activating Levelized Cost switch in Case Manager, and using Var_NcapR in V-BE, I am getting weird results.
What is the best way to calculate Levelized cost (INR/kwh) using VEDA ?