28-08-2018, 07:39 PM
hi Antti,
Thank you for your reply. I have a quick VEDA BE question. I am looking at 2 scenarios: BAU and BAU with the levelized cost option turned on. I have turned on the levelized annual costs switch by adding the "$SET ANNCOST LEV" table to the SysSettings file. When I take the reported values from VEDA BE for each period from 2010-2050 and discount back to calculate the NPV for ObjZ I get exactly the same number: 51,279,034 reported by VEDA BE.
What I am wondering is why I get the exact number before subtracting the salvage value costs in my calculation? Does the levelized annual costs option somehow already include the salvage value? I have attached the results table from VEDA BE and the simple excel sheet that I used for this calculation.
Thank you,
Mike
Thank you for your reply. I have a quick VEDA BE question. I am looking at 2 scenarios: BAU and BAU with the levelized cost option turned on. I have turned on the levelized annual costs switch by adding the "$SET ANNCOST LEV" table to the SysSettings file. When I take the reported values from VEDA BE for each period from 2010-2050 and discount back to calculate the NPV for ObjZ I get exactly the same number: 51,279,034 reported by VEDA BE.
What I am wondering is why I get the exact number before subtracting the salvage value costs in my calculation? Does the levelized annual costs option somehow already include the salvage value? I have attached the results table from VEDA BE and the simple excel sheet that I used for this calculation.
Thank you,
Mike