Hi! I have a model with some trade process between regions. I want its costs (both variable and fixed costs) to change over time.
I declared both FIXOM and ACT_COST for the base year (2013) in the "ScenTrade_Transmission" file, as show below:
Then, in a separate scenario file, I declared modifications for both FIXOM and VAROM in a TFM_INS table:
The question is that, analyzing the results, the variable costs are indeed changing as specified in the files. However, the model is not changing the fixed costs along the horizon (see the excel file attached, in which I exported a table from VEDA-BE with Cost_ACT and Cost_FOM and divided by VAR_FIn and VAR_CAP, respectively, in order to calculate the fixom and varom the model is considering. The latter does not correspond to the value specified in the scenario file).
Thanks a lot!
I declared both FIXOM and ACT_COST for the base year (2013) in the "ScenTrade_Transmission" file, as show below:
Then, in a separate scenario file, I declared modifications for both FIXOM and VAROM in a TFM_INS table:
The question is that, analyzing the results, the variable costs are indeed changing as specified in the files. However, the model is not changing the fixed costs along the horizon (see the excel file attached, in which I exported a table from VEDA-BE with Cost_ACT and Cost_FOM and divided by VAR_FIn and VAR_CAP, respectively, in order to calculate the fixom and varom the model is considering. The latter does not correspond to the value specified in the scenario file).
Thanks a lot!